Electricity & Water Plan

Special Event Utility Plan


Electricity Plan

An Electricity Plan may be required for your event. Include the location of any generators and cords on your electricity plan. 

Electric service may be available from the City of Stillwater

  • The City can provide the service connections and metering needed, but event organizer(s) will need to hire a licensed electrician to install the necessary outlets, breakers and other wiring. A permit will be needed for this work. 

  • Event organizer(s) are responsible for the cost of electricity used at the event. 

The Special Events Coordinator will assist you in setting up this service.


Water Plan

A Water Plan may be required for your event. 

Water service may be available from the City of Stillwater

  • The City can provide the service connections and metering needed, but event organizer(s) will need to hire a licensed plumber to install any additional piping needed from the meter. A permit will be needed for this work. 

  • Event organizer(s) are responsible for the cost of water used at the event. 


The Special Events Coordinator will assist you in setting up this service.


Content last reviewed 05.12.2020